Skip to main content
Gebze / Kocaeli Factory · EXW / FCA / CIF Export +90 505 507 04 18
SERCONTAINER Modular Containers & Frame Systems
Coupled & 2-Storey Modular Complexes · EPC, Mining & Energy Camps

Turnkey Construction Camps, Coupled & Multi-Storey Modular Projects

Designed by Architect İdris YAĞMAHAN & Civil Engineer Celalettin YAĞMAHAN for EPC contractors, mining, energy, and infrastructure sites. Combine gasketed side-by-side modules and 2-storey steel-staircase blocks into complete accommodation, dining, management office, and sanitary camps.

1–2 Storeys External Steel Staircase & Walkway Blocks
Coupled Span 42 m² to 200+ m² Open Dining & Office Halls
A1 / PIR Rockwool Non-Combustible & Hot-Climate Spec
200 kg/m² Floor Live Load on C25/30 ±0 mm Supports
SERCONTAINER ENGINEERING & B2B ARCHITECTURE

2-Storey Coupled Modular Construction Camp Elevation & Engineering Section

C25/30 LASER-LEVELED CONCRETE FOUNDATION (±0 mm) · 200 kg/m² FLOOR RATING A1 ROCKWOOL / PIR + SPLIT A/C READY
UPPER FLOOR: DORMITORY / MANAGEMENT Galvanized Steel Staircase + Safety Walkway
GROUND FLOOR: DINING / OPEN OFFICE EPDM Gasketed Coupled Module Joints · 200 kg/m²
FOUNDATION: C25/30 STRIP (±0 mm) Rockwool A1 / PIR Panels + Split A/C Provisions

Engineering Architecture of SerContainer Camp & Multi-Storey Complexes

1. Side-by-Side Coupled Open-Plan Halls (42 m², 63 m², 105 m²+)

By removing internal wall panels along intermediate chassis axes and sealing joints with EPDM weatherproofing strips and internal trim flashings, 3×7 m or 2.4×6 m modules form wide-span dining halls, technical offices, and briefing rooms.

2. Two-Storey Dormitory & Engineering Office Blocks

Cut camp land footprint by 50%. Upper-storey containers bolt securely onto reinforced lower columns, accessed via bolt-on galvanized steel staircases and cantilevered safety-railed walkways.

3. Complete Single-Source Camp Ecosystem (Sleep + Dine + Work + Wash)

Procure every camp zone from one factory: SC-K worker/engineer dormitories, SC-MK Metropol executive offices, SC-IK multi-stall WC/shower/laundry blocks, and SC-GK perimeter security cabins.

4. MENA / Hot-Climate (+50°C) & A1 Fire-Rated Camp Package

For oil, gas, mining, and Gulf/MENA camps, upgrade wall and roof insulation to A1 non-combustible Rockwool or high-density PIR panels with pre-wired Split A/C electrical circuits and condensate drains.

SERCONTAINER · GEBZE FACTORY MATRIX

Modular Construction Camp Functional Building Matrix

Camp Zone / Building Base Catalog Series Configuration Options Insulation & Climate Spec Shipping Mode Dispatch Schedule
Worker & Staff Dormitories SC-K01..SC-K18 (21 m²) Single, Coupled or 2-Storey Walkway Block EPS Std. / A1 Rockwool or PIR Upgrade Flat-Pack (8–10/TIR) or Assembled 5–10 Days + Phased Lots
EPC Management & Site Offices SC-MK01..10 & Coupled SC-K Open-Plan Coupled + Executive Rooms + WC High-Density Sandwich Panel + A/C Prep Flat-Pack or Assembled TIR 5–10 Days + Phased Lots
Camp Dining Hall & Recreation Multi-Module Coupled 3×7 m 2× to 8× Coupled Wide-Span Hall Washable Hygienic Interior + Rockwool/PIR Demountable Kit / Flat-Pack Phased Project Schedule
Central WC, Shower & Laundry SC-IK01..SC-IK07 (5–21 m²) Multi-Cabin Male/Female + Accessible Units Waterproof Wet-Area Floor & Plumbing Assembled or Pre-Plumbed Pack 5–10 Business Days
Gatehouse & Perimeter Security SC-GK01..SC-GK03 (7 m²) 360° Glazed Guard & Access Control Booth Insulated Sandwich Panel + Elec. Panel 4–6 Units Consolidated / TIR 5–10 Business Days
SerContainer B2B & Commercial Partnership Desk

Dealership, Wholesale & Project Pre-Application Form

Complete the form below to send a structured commercial request directly to our Gebze factory desk via WhatsApp (+90 505 507 04 18) or print an official 1-Page Corporate A4 PDF Application Sheet.

FAQ · SerContainer

Frequently Asked Technical & Export Questions

Can construction camp buildings be shipped demounted (flat-pack) to reduce overseas freight?

Yes. Large international camps are typically shipped as complete demountable flat-pack modules (8–10 units per TIR / 40' HC) with numbered bolt-on staircases, walkways, and coupling gasket kits.

What concrete foundation is required for coupled and 2-storey container complexes?

A leveled C25/30 concrete strip or raft foundation with ±0 mm laser-checked elevation tolerance is mandatory so coupled chassis seal cleanly and doors operate without binding.

Do you offer A1 fire-rated Rockwool panels for oil, gas, and mining camps?

Yes. Our Hot Climate & Camp Package upgrades wall and roof panels to A1 non-combustible Rockwool or PIR insulation and adds dedicated Split A/C electrical lines.

Are external steel stairs and upper-floor walkways manufactured at your Gebze plant?

Yes. Bolt-together galvanized/painted steel staircases, landing platforms, and safety handrails for 2-storey camp blocks are fabricated in-house for exact structural fit.

How do you handle delivery timelines for multi-unit camp projects?

Initial priority units (gatehouse, site office, first sanitary/dormitory lot) dispatch within 5–10 business days, followed by scheduled weekly TIR/container batches aligned with your site mobilization plan.

WhatsApp Quote