13.60 m TIR Overland & Multimodal 40' HC Container Rail
Dispatch Gate / Port: Sarp / Gürbulak → Trans-Caspian Middle Corridor TIR & 40' HC Container Rail
Direct factory supply from our Gebze / Kocaeli manufacturing plant to Uzbekistan (Tashkent, Samarkand, Bukhara, Navoi, Andijan, Namangan, Fergana). Compare 72 bolt-together steel frame kits (painted & galvanized, flat & gable A-roof; MOQ 10 sets on 3×7 m, 20 sets on other sizes) and 38 turnkey modular containers with transparent EXW, CIF and DAP export pricing.
Dispatch Gate / Port: Sarp / Gürbulak → Trans-Caspian Middle Corridor TIR & 40' HC Container Rail
Certificate of Origin, Commercial Invoice, Detailed Bundle Packing List, CMR + TIR Carnet / SMGS Rail Bill
Incoterms: EXW / FCA Gebze · CPT / DAP Tashkent, Samarkand, Navoi, Bukhara
Corrosion-resistant galvanized steel frame kits (MOQ 10 sets on 3×7 m / 20 sets others) and turnkey modular units compatible with our Hot Climate Upgrade (Rockwool/PIR insulation + Split A/C prep) for Uzbekistan.
| Product Category | Packaging Format | 13.60 m Standard TIR | 40' High Cube (40' HC) | MOQ Policy |
|---|---|---|---|---|
| Flat-Roof Steel Frame Kits (FR-P / FR-G) | Strapped steel bundles + bolted hardware box | 22 – 28 Frame Kits | 20 – 26 Frame Kits | 10 Sets (3×7 m) · 20 Sets (other sizes) |
| Gable A-Roof Steel Frame Kits (GR-P / GR-G) | Strapped steel bundles + A-roof truss bundle | 20 – 24 Frame Kits | 18 – 22 Frame Kits | 10 Sets (3×7 m) · 20 Sets (other sizes) |
| Ready Modular Containers (SC-K 3×7 m / SC-MK 2.4×6 m) | Turnkey assembled OR demounted flat-pack | 2 Units Assembled (or 6–8 Flat-Pack) | 6 – 8 Units Flat-Pack | 1+ Unit (no fixed minimum) |
| Guard Cabins (SC-GK) & Sanitary Units (SC-IK) | Turnkey factory-assembled with electrical & plumbing | 4 – 8 Units Assembled | 4 – 6 Units | 1+ Unit (no fixed minimum) |
Select frame kits (min. 10 sets for 3×7 m, 20 sets for other sizes — mixed models accepted) or ready modular containers (1+ unit), check truck/40' HC loading capacity, and send directly to our engineering team via WhatsApp.
Shipments are dispatched from our Gebze / Kocaeli factory via Sarp / Gürbulak → Trans-Caspian Middle Corridor TIR & 40' HC Container Rail using 13.60 m TIR Overland & Multimodal 40' HC Container Rail. Estimated transit time is 10 – 16 Days (Tashkent, Samarkand, Bukhara, Navoi, Andijan), covering major project hubs including Tashkent, Samarkand, Bukhara, Navoi, Andijan, Namangan, Fergana.
For steel container frame kits (FR-P, FR-G, GR-P, GR-G), the minimum order is 10 sets for 3×7 m models and 20 sets for all other dimensions (mixed coatings and roof types accepted; 1 TIR truck or 40' HC container holds 20–28 frame kits). Ready modular containers have no fixed minimum order (1+ unit available).
Every shipment includes full export documentation: Certificate of Origin, Commercial Invoice, Detailed Bundle Packing List, CMR + TIR Carnet / SMGS Rail Bill. Harmonized System (HS) tariff classifications: 7308.90 · 9406.90. Supported Incoterms: EXW / FCA Gebze · CPT / DAP Tashkent, Samarkand, Navoi, Bukhara.
For high-temperature operating conditions in Uzbekistan, we recommend corrosion-resistant Galvanized Frame Kits (FR-G / GR-G) and our optional Hot Climate & Camp Package (Rockwool / PIR insulation upgrade, reinforced roof insulation, and Split A/C provisions) on ready modular units.