Direct 13.60 m TIR Overland Trucking from Gebze Factory
Dispatch Gate / Port: Kapıkule / Hamzabeyli Border Gates → Central European TIR Corridor
Direct factory supply from our Gebze / Kocaeli manufacturing plant to Poland (Warsaw, Kraków, Wrocław, Poznań, Gdańsk, Katowice, Łódź). Compare 72 bolt-together steel frame kits (painted & galvanized, flat & gable A-roof, MOQ 20 sets mixed) and 38 turnkey modular containers with transparent EXW, CIF and DAP export pricing.
Dispatch Gate / Port: Kapıkule / Hamzabeyli Border Gates → Central European TIR Corridor
ATR Movement Certificate (EU Customs Union), Commercial Invoice, Bundle Packing List, CMR Waybill
Incoterms: EXW / FCA Gebze · CPT / DAP Warsaw, Kraków, Wrocław, Poznań, Gdańsk
High-load Gable A-Roof steel frame kits with reinforced structural roof trusses and insulated double-glazed modular containers engineered for Poland.
| Product Category | Packaging Format | 13.60 m Standard TIR | 40' High Cube (40' HC) | MOQ Policy |
|---|---|---|---|---|
| Flat-Roof Steel Frame Kits (FR-P / FR-G) | Strapped steel bundles + bolted hardware box | 22 – 28 Frame Kits | 20 – 26 Frame Kits | 20 Sets (mixed models/sizes accepted) |
| Gable A-Roof Steel Frame Kits (GR-P / GR-G) | Strapped steel bundles + A-roof truss bundle | 20 – 24 Frame Kits | 18 – 22 Frame Kits | 20 Sets (mixed with flat-roof accepted) |
| Ready Modular Containers (SC-K 3×7 m / SC-MK 2.4×6 m) | Turnkey assembled OR demounted flat-pack | 2 Units Assembled (or 6–8 Flat-Pack) | 6 – 8 Units Flat-Pack | 1+ Unit (no fixed minimum) |
| Guard Cabins (SC-GK) & Sanitary Units (SC-IK) | Turnkey factory-assembled with electrical & plumbing | 4 – 8 Units Assembled | 4 – 6 Units | 1+ Unit (no fixed minimum) |
Select frame kits (min. 20 sets — mixed dimensions, roof types and finishes accepted) or ready modular containers (1+ unit), check truck/40' HC loading capacity, and send directly to our engineering team via WhatsApp.
Shipments are dispatched from our Gebze / Kocaeli factory via Kapıkule / Hamzabeyli Border Gates → Central European TIR Corridor using Direct 13.60 m TIR Overland Trucking from Gebze Factory. Estimated transit time is 4 – 6 Days (Warsaw, Kraków, Wrocław, Poznań, Gdańsk, Katowice, Łódź), covering major project hubs including Warsaw, Kraków, Wrocław, Poznań, Gdańsk, Katowice, Łódź.
For steel container frame kits (FR-P, FR-G, GR-P, GR-G), the minimum order is 20 sets, and mixed dimensions, coatings, and roof types totaling 20 sets are accepted (1 TIR truck or 40' HC container holds 20–28 frame kits). Ready modular containers have no fixed minimum order (1+ unit available).
Every shipment includes full export documentation: ATR Movement Certificate (EU Customs Union), Commercial Invoice, Bundle Packing List, CMR Waybill. Harmonized System (HS) tariff classifications: 7308.90 · 9406.90. Supported Incoterms: EXW / FCA Gebze · CPT / DAP Warsaw, Kraków, Wrocław, Poznań, Gdańsk.
For snow load and precipitation drainage in Poland, we recommend Galvanized Gable A-Roof Frame Kits (GR-G, featuring reinforced structural roof trusses) and insulated sandwich-panel modular units with 4+12+4 mm double-glazed PVC windows.