Direct Ro-Ro (Trieste / Bari) + 13.60 m TIR & 40' HC Container Sea Freight
Dispatch Gate / Port: Pendik / Yalova → Port of Trieste & Bari Direct Ro-Ro + 40' HC Sea Freight
Direct factory supply from our Gebze / Kocaeli manufacturing plant to Italy (Milan, Trieste, Rome, Bologna, Turin, Genoa, Bari, Venice). Compare 72 bolt-together steel frame kits (painted & galvanized, flat & gable A-roof, MOQ 20 sets mixed) and 38 turnkey modular containers with transparent EXW, CIF and DAP export pricing.
Dispatch Gate / Port: Pendik / Yalova → Port of Trieste & Bari Direct Ro-Ro + 40' HC Sea Freight
ATR Movement Certificate (EU Customs Union), Commercial Invoice, Packing List, CMR / B/L
Incoterms: EXW / FCA Gebze · CIF Trieste / Genoa / Bari · DAP Milan, Rome, Bologna
Optimized 20+ mixed frame kit bundles for local manufacturers in Italy and turnkey living, office, security and sanitary containers.
| Product Category | Packaging Format | 13.60 m Standard TIR | 40' High Cube (40' HC) | MOQ Policy |
|---|---|---|---|---|
| Flat-Roof Steel Frame Kits (FR-P / FR-G) | Strapped steel bundles + bolted hardware box | 22 – 28 Frame Kits | 20 – 26 Frame Kits | 20 Sets (mixed models/sizes accepted) |
| Gable A-Roof Steel Frame Kits (GR-P / GR-G) | Strapped steel bundles + A-roof truss bundle | 20 – 24 Frame Kits | 18 – 22 Frame Kits | 20 Sets (mixed with flat-roof accepted) |
| Ready Modular Containers (SC-K 3×7 m / SC-MK 2.4×6 m) | Turnkey assembled OR demounted flat-pack | 2 Units Assembled (or 6–8 Flat-Pack) | 6 – 8 Units Flat-Pack | 1+ Unit (no fixed minimum) |
| Guard Cabins (SC-GK) & Sanitary Units (SC-IK) | Turnkey factory-assembled with electrical & plumbing | 4 – 8 Units Assembled | 4 – 6 Units | 1+ Unit (no fixed minimum) |
Select frame kits (min. 20 sets — mixed dimensions, roof types and finishes accepted) or ready modular containers (1+ unit), check truck/40' HC loading capacity, and send directly to our engineering team via WhatsApp.
Shipments are dispatched from our Gebze / Kocaeli factory via Pendik / Yalova → Port of Trieste & Bari Direct Ro-Ro + 40' HC Sea Freight using Direct Ro-Ro (Trieste / Bari) + 13.60 m TIR & 40' HC Container Sea Freight. Estimated transit time is 3 – 6 Days (Trieste, Milan, Bologna, Turin, Venice, Rome, Bari, Genoa), covering major project hubs including Milan, Trieste, Rome, Bologna, Turin, Genoa, Bari, Venice.
For steel container frame kits (FR-P, FR-G, GR-P, GR-G), the minimum order is 20 sets, and mixed dimensions, coatings, and roof types totaling 20 sets are accepted (1 TIR truck or 40' HC container holds 20–28 frame kits). Ready modular containers have no fixed minimum order (1+ unit available).
Every shipment includes full export documentation: ATR Movement Certificate (EU Customs Union), Commercial Invoice, Packing List, CMR / B/L. Harmonized System (HS) tariff classifications: 7308.90 · 9406.90. Supported Incoterms: EXW / FCA Gebze · CIF Trieste / Genoa / Bari · DAP Milan, Rome, Bologna.
For local container manufacturers in Italy, mixed 20+ frame kit bundles (Painted & Galvanized, Flat & Gable roof) optimize truck loading; for construction and commercial buyers, turnkey SC-K (3×7 m), SC-MK (2.4×6 m), SC-GK guard cabins, and SC-IK sanitary units are recommended.